TRACERCO Diagnostics™ - Pipeline Assurance - Determining Total Amount of Deposition Subsea Pipeline Tracerco had been requested by a North Sea major to determine the total amount of deposit within a 22km long, 16” diameter subsea pipeline running between two platforms, by the use of the TRACERCO Diagnostics™ Flow Assurance Study....more
TRACERCO Diagnostics™ - Pipeline Assurance - Pig Tracking Services During Repair of 24” Pipeline Tracerco - Dialog Alliance were requested by a large Oil company in South East Asia to provide TRACERCO Diagnostics™ Pig Tracking services during the repair of a 24 inch Pipeline offshore Malaysia. A team of trained and experienced Tracerco carried out the job – Dialog personnel in accordance with proven techniques and equipment....more
TRACERCO Diagnostics™ - Scan - Pipeline Scale and Blockages Located During a routine refinery shutdown, the knockout pot on the header system to the flare line was found to contain scale and corrosion products. The possibility of significant build-up of sections of the line worried engineers. If deposits were present these should be attended to during the shutdown....more
TRACERCO Diagnostics™ - Pipeline Assurance - Pigging of a 16” Pipeline Tracerco was requested by a North Sea oil company to provide a radioisotope tracking service during the pigging of a 16-inch pipeline within a 20-inch outer pipe, between two platforms by the use of TRACERCO Diagnostics™ Pig Tracker service. The technique relies on a small radioactive source being attached to the pig prior to launching....more
|
|