In any deep water field development it is important to monitor water and oil production from all wells in order to manage fluid movement and maximise hydrocarbon recovery.
Download the case study using the form below to learn how the use of smart tracer technology integrated into a lower completion, alongside the use of waterflood tracers, allowed an operator to optimise water injection balance and minimise water production, at a fraction of the cost of a PLT.
Contact us today or email us at tracerco@tracerco.com