Using Discovery™ in a pipeline lifetime extension project

An operator Tracerco were working with had a heavily coated, unpiggable pipeline, with an attached piggyback line, that was close to the end of its original design life. DiscoveryTM was used to obtain accurate wall thickness measurements of both lines, at the same time.

Download the case study using the form below to learn how the operator used this vital integrity data as part of a pipeline lifetime extension assessment.

Download the case study

Contact us today or email us at tracerco@tracerco.com

  • We measure the unmeasurable
  • We access the inaccessible
  • We help solve the impossible